Nhan River Bridge

30/10/2023 14:29:32 290 Viewers
Nhan River Bridge
Nhan River Bridge

 

Nhan River - Dau Giay road has a length of more than 12km, the starting point of the route starts from Huong Lo 10 (Cam My - Long Thanh road) and the end point is at Nhan River bridge (Thong Nhat district).

Nhan - Dau Giay River Road, invested by the Provincial Construction Investment Project Management Board, started construction in November 2017 with a total capital of 84 billion VND.

The Song Nhan - Dau Giay road project is building 3 bridges on the route including: Suoi Duc bridge with a span of 12m long, bridge width of 9m, carriageway section of 8m; Military Hospital Bridge has a span of 24m long; Suoi Ram bridge also has a span of 33m long. All bridge girders are cast in prestressed reinforced concrete; The bridge surface is covered with hot asphalt concrete. The bridge is designed according to load capacity HL93 (for vehicles carrying the correct design load) with no load limit on the bridge.

The completed project aims to upgrade the transportation system, better serving people's transportation of goods and urban culture and aesthetics.

TN E&C supplied and installed girder I.24.54m - HL93.

 

Image of girder installation for the Nhan River Bridge project

Other projects
0 Evaluate about Nhan River Bridge
MEDIUM STAR
0
5
0 Star
4
0 Star
3
0 Star
2
0 Star
1
0 Star
Please select a review:
CAPTCHA
0777 867 475
0777 867 475
Zalo chat